Izolace na klíč 775 654 443

What drives the price

There is no price list for damp proofing, and anyone who shows you one before a survey is guessing. But it is possible to describe exactly what the budget is built from. With that you can compare two quotes and, more importantly, see what is not in the cheaper one.

Brick masonry with a horizontal band of decayed mortar and damaged bricks

What the budget is built from

1. Scope: metres, not rooms

For a barrier against rising damp, what counts is the length of wall to be sawn or injected and the thickness of the masonry, because that sets both the depth of the holes and the difficulty of the cut. For foundation waterproofing it is the metres of excavation and its depth. A quote that talks about a house rather than about metres cannot be compared with anything.

2. The chosen method

Injection, sawing and excavation differ in labour and in what has to happen around them. But the method is not selected to suit a budget; it follows from the cause and from the masonry. If a cheaper method appears somewhere, it is fair to ask what it will leave unsolved.

3. Access

Whether the wall can be reached from both sides, whether machinery can get in, whether digging is possible, where the soil will go, whether the house sits on the plot boundary. This moves the price more than people expect, and it cannot be judged from a photo.

4. State of the masonry and salts

Salt-laden, long-wet masonry means more work with plaster and sometimes a different technology altogether. How high plaster is removed and which type replaces it follow from the survey, not from a standard rate.

5. Plaster and finishes

Hacking off, letting the wall breathe, new plaster, paint, and possibly reworking the plinth. This is the item cheap quotes most often omit, and it tends to be a substantial part of the budget. A barrier without the plaster sorted will not give you a usable wall.

6. The work around it

Protecting floors, removing rubble, adjusting the fall of the ground, rerouting a downpipe, reinstating the path after excavation, and with drainage the connection to an outlet. None of it is an extra; it all belongs to the job.

7. Evidence and checks

The data sheet for the product or membrane used, a record of quantities, the number and spacing of holes, photographs of what gets covered up. A contractor who provides this will have priced it in, and it is one of the few items where cutting is a false economy.

How to compare two quotes

  • Compare metres, not totals. Without the length of wall and the depth of excavation there is nothing to compare.
  • Check that both quotes address the same cause and in the same way.
  • Find the items one quote has and the other does not. Usually they are not padding but what the other left out.
  • Ask what happens if the situation turns out different once work starts, and who approves extras.
  • Ask what the warranty covers. Workmanship yes; speed of drying, by its nature, no.

Half an hour over that comparison tells you more than picking the lowest number. With damp proofing the mistake only shows years later, by which time the quote is long forgotten.

What we do about it

There is no price list here and there never will be. Tell us how the damp behaves and we will go through the parameters from this page with you, fill in what is missing and pass the enquiry to a company that does damp proofing in your area. The binding figure comes from them, in writing, after the survey.

Tell us where it is damp

A few sentences are enough. We read every enquiry, fill in the missing details with you and pass it to a company that does damp proofing in your area. If we have nobody there, we say so straight away instead of leaving you waiting.

Prefer to call? 775 654 443

Only the e-mail is required. Add a phone number if you would rather sort the details out by phone.

Frequently asked questions

Why is there no price list on this site?

Because it would lie. With damp proofing, the budget comes from the length of the walls, the thickness of the masonry, access, the extent of excavation and what is done with the plaster, and those vary so much between houses that an average figure means nothing. What goes into the budget is on this page.

Should the survey be paid for?

A survey is skilled work that takes time and involves opening up the structure. When it is not charged for, it usually is not done properly and the method is chosen by eye. A paid survey whose output you can take away is cheaper than the wrong method.

How do I spot a suspiciously low quote?

By what is not in it. No line for the survey, nothing about plaster, no extent of excavation in metres, no type of product or membrane. Those are not details; they are things that get invoiced later, or simply never done.