Damp proofing injection is a retrofitted horizontal barrier against rising damp. A row of holes is drilled into the wall along one plane and a product is introduced that closes the capillaries in the masonry. The main advantage is that nothing has to be broken open, and the method also works where a saw cannot be used.

Mixed stone and brick masonry, the kind of substrate a retrofitted horizontal barrier is made in

How injection works

Masonry draws water up through capillaries, a network of tiny pores that acts like a wick. Injection interrupts that network along one horizontal plane: a product is introduced into drilled holes, spreads through the masonry, reacts with the moisture and either narrows the pores or makes them water repellent. Above that plane the water has no route upwards.

The decisive word is continuous. A barrier only works when the individual holes link up inside the masonry. That is why the spacing, diameter and angle of the holes matter, and above all whether the product spreads far enough. A barrier with a gap in it is as useful as a dam with a hole.

How the work goes

  1. Survey and design. Material and thickness of the masonry, absorbency, height of the damp band, choice of product and of the plane the barrier will follow.
  2. Preparation. Plaster hacked off in the working band, floors protected, and with salt-laden walls an assessment of what has to come off.
  3. Drilling. Holes in one plane, at the designed spacing, diameter and angle. With thick walls they are sometimes drilled from both sides.
  4. Introducing the product. Topped up without pressure, or pumped in, depending on the chosen technology and on how absorbent the masonry is.
  5. Closing the holes and plastering. The holes are made good, and then new plaster is dealt with according to the state of the wall.

When injection makes no sense

  • When the wall is not rising damp. Injection has no effect on condensation, leaks or a burst pipe. That is the most common reason people say injection "did not work".
  • With water under pressure. A horizontal barrier does nothing about water pushing from the side or from below.
  • When the main route is lateral. A cellar wall against soil needs vertical waterproofing, not a horizontal barrier.
  • In masonry with large voids, until they are filled. The product would be lost in them.

Injection or sawing

Both create a retrofitted horizontal barrier; they differ in how. Injection is chemical and does not touch the structure, it can be used where a saw cannot reach, and it copes with irregular and mixed masonry. Sawing sets a physical membrane into the joint, so the result can be checked by eye, but it needs a regular continuous bed joint and access to the wall.

In practice the masonry decides, not preference. A good contractor will tell you why they propose one of them and describe what the problem would be with the other.

Tell us where it is damp

A few sentences are enough. We read every enquiry, fill in the missing details with you and pass it to a company that does damp proofing in your area. If we have nobody there, we say so straight away instead of leaving you waiting.

Prefer to call? 775 654 443

Only the e-mail is required. Add a phone number if you would rather sort the details out by phone.

Frequently asked questions

What is the difference between pressure and pressureless injection?

With the pressureless method the product is topped up in the holes and drawn in by the masonry itself. With pressure and low-pressure methods it is pumped in, so it also reaches masonry that does not absorb on its own. Cream products are applied into the hole in a thicker consistency. Which option is in play is decided by the material and absorbency of the masonry, not by the contractor's preference.

Can stone or mixed masonry be injected?

It is harder than with regular brickwork, because stone itself has no capillaries and water rises through mortar joints and voids. Sometimes the voids are filled before injection. With such masonry it matters all the more that the contractor explains how they intend to create a continuous barrier.

What should be documented afterwards?

Which product was used and its data sheet, the spacing and diameter of the holes, how many there were and at what height above the floor, and the quantity used. From that it is possible to judge afterwards whether the barrier could have been continuous. If the contractor has no answer to these, all you are left with is a drilled wall.